Miami Pre-Construction 2026: What the Closed Data Says Before You Sign

Miami Pre-Construction Due Diligence 2026

Ashton Coleman, Broker Associate, ONE Sotheby’s International Realty
📞 305.978.7704 · 📧 AColeman@onesothebysrealty.com

The Short Answer

The risk in Miami pre-construction is not that a building fails to get built. Most of them get built. The risk is that you cannot verify what you are paying, because there is nothing to compare it to, and you may not be able to get out before delivery. Both of those are measurable, and the MLS measures them.

Across Miami-Dade new-construction condominium listings priced at $1,000,000 and above, 306 of 579 resolved listings failed to sell, which is 53%. More than half. For comparison, the same measurement on Sunny Isles resale condominiums is 38% and on new-construction houses 36%.

And the failure rate climbs the further out delivery sits. For buildings delivered in 2024 it is 31%. For 2025, 48%. For 2026, 90%. For 2027, 2028 and 2029, it is 100%, because those years have recorded 41, 18 and 19 failed listings against zero closings.

Seventy-eight listings in buildings that have not been delivered came off the market without selling. Their median asking price was $2,787,775, at $1,653 per square foot, and they sat a median 318 days before withdrawal. Somebody tried to sell an undelivered residence for nearly a year and could not.

Of the 422 distinct new-construction buildings in this file, only 121 have recorded a single closing. Seventy-one percent have no transaction history at all.

None of that makes pre-construction a bad purchase. It makes it a purchase you cannot verify with comparables, which is a different thing and calls for a different kind of diligence.

What “No Closings” Actually Means, and What It Does Not

Fifty-one buildings in this file have three or more live listings and zero closings, holding about 300 listings between them. That extends a narrower count I published in Miami New Construction 2026, which found fourteen buildings holding 121 listings with nothing closed. Same measurement, lower threshold, bigger number.

It is worth being precise about what that figure is and is not.

A building with no closings is not a troubled building. If it has not been delivered, nothing can have closed, and the absence of sales is simply the calendar. Casa Bella, One Park Tower, 2200 Brickell, Ritz-Carlton South Beach, The Standard Residences, The Well, Fouquet’s, Kempinski Residences, 72 Park and Waldorf Astoria Residences Miami all appear in that group, and several of them are among the better-regarded projects in the city.

What it does mean is that no price in that building has been tested. Every figure attached to it is an asking price. A developer price list is an asking price. A broker’s comparable from inside the same building is an asking price. Until a residence changes hands at arm’s length, nobody knows what the market pays, including the developer.

That is the actual exposure. You are buying without comparables, in a market where the same analysis on delivered buildings shows sellers taking 89.0% of their original asking price.

The Failure Rate Rises With Distance From Delivery

Delivery yearClosed salesListings that failedFailure rateLive listings
20241818031%129
2025898348%126
202676590%280
2027041100%63
2028018100%59
2029019100%25

Read the 2026 row carefully, because it is the one that matters to anyone signing now. Buildings delivering this year have produced seven closings against 280 live listings and 65 failures. The product is arriving and it is not trading.

The 100% rows need a caveat and they survive it. A building delivering in 2028 cannot produce a closing yet, so a 100% failure rate among resolved listings is partly definitional. What is not definitional is the numerator. Seventy-eight people listed residences in undelivered buildings and took them off the market without a sale. Those are real attempts to exit, and they did not work.

The 2024 row is the encouraging one and it deserves equal weight. Buildings delivered two years ago show 181 closings against 80 failures. Once a building delivers and establishes prices, it starts to function. The difficulty is concentrated in the window before that happens.

What the Exit Looks Like Before Delivery

MeasureListings in undelivered buildings, 2027 delivery and later
Currently listed160
Came off the market without selling78
Closed sales1
Median asking price of the failed listings$2,787,775
Median asking rate of the failed listings$1,653/SF
Median days on market before withdrawal318

One closing. One hundred and sixty residences currently asking. Seventy-eight that gave up after a median of ten and a half months.

If your plan involves selling before you close, or selling soon after, this table is the evidence on how that goes. It is not that it cannot be done. It is that in this market, at this moment, almost nobody has done it.

Two Buildings That Show Both Ends of the Problem

Bentley Residences has no MLS data at all. Not a single closed sale, because developer contracts do not pass through the MLS and the building has not delivered. Anyone quoting you a value there is quoting an asking price, and I say that as someone who has written a full comparison of that building against its nearest equivalent. The comparison had to be built on specifications, because the price evidence does not exist.

Porsche Design Tower shows what happens afterward. It delivered in 2016. Ten years later, its sellers ask a median $1,812 per square foot and the building achieves $1,131, a gap of 60% and the widest in Sunny Isles by a factor of nearly two. Its residences take a median 512 days to sell and its sellers take 85.0% of their original asking price, both the weakest results of any building in that city with real transaction depth.

A decade after delivery, the gap between what owners want and what buyers pay has not closed. That is the long tail of buying into a building before anyone knew what it was worth.

Sunny Isles Beach Pre-Construction Bentley Miami

What to Check Before You Sign

These are the items I work through for a buyer before a pre-construction contract, in the order I work through them.

1. Whether anything in the building has closed

If nothing has, every price you have been shown is an asking price. That is not disqualifying and it is worth knowing explicitly rather than assuming the developer’s list reflects market value.

2. What comparable delivered buildings achieved, not what they asked

Ask for closed sales per square foot in the two or three nearest delivered buildings of similar standard, and ask for them against the original asking price rather than the reduced one. Across new-construction condominiums the median sale took 89.0% of original asking and 93.2% of final asking. The gap between those two figures is the part most reports leave out.

3. The deposit schedule against the delivery date

Match the percentage due at each milestone against the projected completion, and ask what happens to each tranche if completion slips. The 2026 cohort in this data was projected to deliver and has produced seven closings, so slippage is the normal case rather than the exception.

4. Whether the contract permits a resale before closing

Many do not, and some permit it only with developer consent and a fee. Given that 78 undelivered listings failed to sell, the right question is not only whether you are allowed to exit but whether anyone has.

5. Who represents you

The person in the sales gallery works for the developer. That is not a criticism, it is the structure. In Florida the default brokerage relationship is transaction brokerage rather than single agency, which means nobody in that room owes you undivided loyalty unless you have appointed someone who does.

6. What the association fee will actually be

Developer budgets for year one are frequently lower than the stabilized figure, because the developer subsidises early operations and the reserve schedule has not matured. Ask for the projected budget and the reserve study, and compare the fee per square foot against delivered buildings of similar standard rather than against the gallery’s estimate.

7. The developer’s delivered track record in this county

Not their portfolio, their deliveries. Which buildings have they completed in South Florida, when did each deliver against its announced date, and what do those buildings achieve on resale now.

8. What the building will compete against on delivery

Count what is under construction within a mile of it and delivering in the same twelve months. Your resale competition is not today’s inventory, it is what arrives alongside you.

What This Means If You Are Buying Pre-Construction

Treat the developer price list as an asking price, because that is what it is. In 71% of the new-construction buildings in this file, no residence has ever closed, so there is no evidence either way on whether those prices are right.

Assume you will own it through delivery. One closing against 160 live listings and 78 failures in buildings delivering 2027 and later is the measured reality of the pre-delivery exit.

Buy the building, not the renderings. Location, floor plan, frontage and what gets built next to you are the things you cannot change later. Finishes and furniture are the things you can.

Ask for the original list price on every comparable. Sellers of delivered new construction take a median 89.0% of what they first asked. Any comparable quoted at its reduced asking price overstates what the market pays.

If a figure cannot be sourced to a closed sale, ask where it came from. That single question resolves most of what people mean when they ask how to avoid being taken advantage of in this market.

What This Means If You Are Selling a Pre-Construction Contract

The data says this is difficult right now. Seventy-eight attempts, one closing, a median 318 days before withdrawal. Price accordingly or plan to close.

Your competition includes the developer. In a building with remaining inventory you are selling against a party who can offer incentives, absorb carrying costs and wait. You can do none of those.

Check the contract before you list. If assignment requires developer consent, that consent is part of your timeline and worth securing before a buyer is in front of you.

The resale evidence from one slice of this market is now in. Across coastal condominium buildings that permit nightly rental and were delivered since 2019, 55.8% of listings that reached an outcome failed to sell, against 25.9% in buildings delivered earlier, and five downtown towers produced 297 listings and 15 closed sales between them. The detail is in Miami Condo Hotels 2026.

Miami Beach Pre-Construction Tower Crane Skyline

Frequently Asked Questions

Is Miami pre-construction a good investment in 2026?

The closed data does not answer that in the abstract, but it does bound the risk. Across Miami-Dade new-construction condominiums at $1,000,000 and above, 53% of resolved listings failed to sell, sellers of delivered product took a median 89.0% of their original asking price, and buildings delivering in 2026 have produced seven closings against 280 live listings. Buildings delivered in 2024 are functioning normally at 181 closings against 80 failures. The difficulty sits in the window between contract and an established resale market.

How do I do due diligence on a Miami new-construction developer?

Ask for their delivered buildings in South Florida rather than their portfolio, the announced delivery date against the actual date for each, and what those buildings achieve on resale now against what they originally asked. Then ask what has closed in the building you are considering. In 71% of the new-construction buildings in this dataset nothing has closed, which means no price in them has been tested.

Can I sell a Miami pre-construction contract before closing?

Sometimes, depending on the contract, and the evidence says it is hard. Among buildings delivering in 2027 or later, there are 160 live listings, 78 that came off the market without selling after a median 318 days, and one closed sale. Many contracts also require developer consent to assign, and some charge a fee for it.

What are the real risks in buying Miami pre-construction?

Three that the data supports. You cannot verify the price, because 71% of these buildings have no closed sale. You may not be able to exit before delivery, on the evidence of 78 failed attempts against one closing. And the price gap can persist long after delivery: Porsche Design Tower delivered in 2016 and its asking prices still sit 60% above what the building achieves.

Why does a new Miami condo building show no closed sales?

Usually because it has not been delivered. Developer contracts do not pass through the MLS, so a building records its first sale only when residences begin to resell after closing. A building with no sales is not a troubled building. It is a building with no price evidence, which matters for a buyer trying to work out whether an asking price is fair.

Do developer price lists reflect market value?

They reflect what the developer is asking. In a building where nothing has closed, there is no market evidence to test it against. Once comparable buildings deliver and resell, the test becomes available, and across delivered new-construction condominiums in this dataset the median sale came in at 89.0% of the original asking price.

Who represents the buyer at a Miami pre-construction sales gallery?

The person in the gallery works for the developer. In Florida the default brokerage relationship is transaction brokerage rather than single agency, so unless a buyer has appointed someone under single agency, nobody in that transaction owes them undivided loyalty. A buyer can bring their own representation, and in most new developments doing so does not change the purchase price.

How much do new Miami condos sell for below asking?

Delivered new-construction condominiums at $1,000,000 and above closed at a median 93.2% of their final asking price and 89.0% of their original asking price. The 4.2 point difference is the reductions taken before any offer arrived, and it is invisible in the figure most market reports publish.

Will my pre-construction condo’s HOA fee go up after delivery?

Frequently, because year-one budgets often reflect developer subsidy and an immature reserve schedule rather than stabilized operating cost. The practical check is to compare the projected fee per square foot against delivered buildings of similar standard and service, and to read the reserve study rather than the summary.

How many Miami pre-construction buildings are currently selling with no sales history?

Fifty-one buildings in this dataset carry three or more live listings and zero closings, holding roughly 300 listings between them. Across the whole file, 301 of 422 distinct new-construction buildings have never recorded a closing.

Buying Pre-Construction in Miami?

What a pre-construction residence is worth cannot be read off a price list, because in most of these buildings no price has been tested. It depends on what comparable delivered buildings actually achieve against their original asking prices, what is under construction nearby and delivering in the same window, what the association fee becomes once developer subsidy ends, what the contract permits if your circumstances change, and who in the transaction is working for you.

If you’re evaluating a pre-construction purchase anywhere from Brickell and Edgewater through Miami Beach, Surfside, Bal Harbour, Sunny Isles Beach, Aventura or Fort Lauderdale, contact Ashton Coleman for a comparison built on closed sales in delivered buildings rather than on asking prices.

Explore current listings on MiamiPenthousesandEstates.com.

📞 305.978.7704
📧 AColeman@onesothebysrealty.com

About the Market Data

This analysis uses a Southeast Florida MLS (SEFMLS) export of Miami-Dade new-construction listings priced at $1,000,000 and above, covering all statuses. From that file it uses condominiums only, which is 1,279 listings. Of those, 273 are closed sales with a closing date in 2024 or later, 695 are active or pending, and 306 expired, cancelled, withdrew or terminated. The remaining five are closings that fall outside the date range or report no sale price, and they are excluded throughout. Single-family houses from the same export are covered separately in Miami New Construction Homes 2026, and the building-level absorption analysis is in Miami New Construction 2026.

“New construction” means a year built or projected completion of 2024 or later as reported on the listing. Delivery year throughout is that reported figure, which is a projection for buildings not yet complete and moves as schedules move.

The failure rate divides listings that expired, cancelled, withdrew or terminated by the total of those plus closed sales, so it measures resolved listings and excludes the 695 still live. A 100% failure rate for a delivery year with no closings is partly definitional, because an undelivered building cannot record a sale, and the text says so where those rows appear.

Buildings are grouped by the MLS subdivision and complex fields, which are entered inconsistently, so the count of 422 distinct buildings overstates the true number of developments. Several buildings appear under more than one spelling. The direction of the finding is unaffected, but the exact building counts should be read as approximate. The 51 buildings with three or more live listings and no closings, and the 121 with at least one closing, are subject to the same caveat.

Sold to original list price uses the MLS SP/OLP field. A small number of records carry impossible values in that field and are excluded from discount measures only. The Porsche Design Tower and Sunny Isles figures referenced here come from a separate Sunny Isles Beach export covering January 2025 to October 2026, not from this file. MLS information is believed accurate but is not guaranteed.

Disclaimer

Information is provided for informational purposes only and is subject to change without notice. Real estate statistics, listings and sales information should be independently verified. Nothing contained herein constitutes legal, tax, financial or investment advice. Buyers and sellers should consult appropriate professional advisors before making real estate decisions.